Dam Formwork DB180/240

图片
  TECON Dam formwork  DB180 & DB240 is used for forming one-side conrete structure. It has high reliability and bearing capacity for mass concrete structures without tie rods to pull through. It is widely used for in dams, river power stations or navigation locks.   Features of Dam Formwork DB180/240 Can produce both single side inclined wall and double side inclined wall High load capacity without tie rod to pull through concrete structure Shorten crane time due to one unit design of dam formwork Reliable anchorage system and muscular bracket strength ensure the highest on-site safety Can be compatible with all TECON wall formwork system   Specification of Dam Formwork DB180/240 No tie rods are needed to pull through the wall Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for        a crane lift Width of the formwork: 2.2/2.4 Maximum pouring height: 4 m Available incline degree: ±45° Distance of retrusion: 45 cm Ancho

Column Formwork

图片
  Column Formwork TECON column shuttering  system mainly includes Adjustable Steel Frame Column Formwork, Portable round column formwork , BASE 20 Column Formwork, Plastic Round Column Formwork, and Plastic Adjustable Column Formwork.   They can fabricate different kinds of columns at different heights and diameters.   Why Choose Column Formwork The design of the round column shuttering  should be able to withstand the high pressure of fresh concrete because the relatively small cross-section requires rapid pouring of concrete. Therefore, it is essential to seal the joint very carefully and tightly.   The cross-section and height can be adjusted quickly and easily with minimum effort and the minimum number of system components, which is an essential criterion for determining the cost-effectiveness of the column formwork system. In addition, it is usually necessary to build many chromatographic columns with the same cross-section, so these systems need to be quickly transported to the n

Climbing Formwork

图片
  Climbing Formwork TECON self climbing formwork system  mainly includes Self-climbing Formwork TSC80, Jump Climbing Formwork CB180/240, Dam Formwork DB180/240 and Multi-function Climbing Formwork MB180.   Self-climbing formwork TSC80 can climb by itself via hydraulic cylinder, while Formwork CB180/240 can only climb via tower crane lift. Dam Formwork DB180/240 can fabricate both single side wall and double side wall without any tie rod pull through. Multi-function Climbing Formwork MB180 is always guided by its rail during climbing, and it can climb freely with or without tower crane lift sine it has its own mobile hydraulic cylinder.   They are widely used in high-rise buildings, bridge pylons, concrete tanks and other civil engineering project.   Types of Climbing Formwork   Self-climbing Formwork TSC50 & TSC100 TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system lifted by hydraulic cylinders. It offers efficient and cost saving concreting solu

Beam & Slab Formwork

图片
  Beam & Slab Formwork TECON Slab and Beam formwork  system mainly includes Flex 20 Slab Formwork, Slab Table Formwork, Aluflex Slab Formwork, Steel Deck Slab Formwork and Aludeck Slab Formwork.   Slab and beam fabrications are feasible with the three systems in modular formworks, among which are Portable Formwork, Plastic Formwork TP60 and Alu-lite Formwork.   Fabrications of diverse formwork for beam and slab  are feasible, as well as different storey heights, slab thicknesses and shapes, beam widths and depths etc.   Depending on different layouts and customer’s requirements, TECON engineer team will propose the optimal solutions and systems based on cost and site output.   Types of Beam & Types   of Slab Formwork   Slab Flex 20 Formwork TECON Slab Flex 20 formwork is the most ideal and flexible solution not only for normal slab project but also for the most complicated slab plan with drop beams or narrow corners. Slab Flex 20 consists of TECON-Form plywood, H20 timber beam,

Aluminium Formwork

图片
  Aluminium Formwork TECON aluminum alloy formwork  includes Alumni Frame Wall Formwork, Aluflex Slab Formwork, Alugrid Slab Formwork, Aludeck Slab Formwork and AluLITE Formwork.   All those formworks are fabricated entirely by aluminium alloy. Some framed systems are lined with TECON-Form Birch or Plas-tech shuttering as well to achieve more reuses time.   Compared with steel formwork, formwork panels made from aluminium alloy ensures much lighter weight. Thus all of these formworks can be handled manually without a crane lift. Due to their lightweight, it increases site efficiency significantly.   Advantages of Aluminum Formwork The aluminium  formwork  system is a building system used to form cast-in-place concrete structures of buildings. This formwork is made of aluminium alloy, which has high tensile strength and is very hard. Aluminium does not rust like steel. Therefore, the aluminium formwork can be reused hundreds of times. Lightweight aluminium is easy to handle and quick

High Rise Formwork

图片
  High Rise Formwork Safety is the first necessity of high-rise projects and TECON takes safety as its first priority. We not only focus on ensuring project quality, but also pay great attention to the personal safety of laborers.  Hence with a think-tank in TECON technical team and cutting-edge technology in producing different types of formwork, we are able to give birth to TECON sophisticated self-climbing and climbing formworks, as well as facade protection, all with fully closed multi-platforms.   The Advantages of Teconform High Rise Formwork All TECON formwork for high rise building  offers construction sites steady & high-safety progress during self-climbing via hydraulic cylinders or other power units. All TECON climbing brackets can be rescheduled together with right size shuttering in order to fit any size and shape highrise buildings without worry about its reuse and cost.   Reliable embedded anchor system and multi-platform with facade protection maximize the safety an

Bridge Formwork

图片
  To span, a bridge is to make knowledge to experience. TECON is firmly committed to building its lead in formwork-technology. This is the reason it continues developing measures to boost construction efficiency and putting them into practice systematically.   TECON formwork solutions always come as a package that delivers tangible benefits and added value to our customers. We have a client-orientated mindset and 'build bridges' to our customers' goals.       The Advantages of Teconform Bridge Formwork The automatic climbing formwork handles significant variations in the design of piers and pylons, regardless of geometry, height, and dimension.   Cost-effective and on-time delivery of material-optimized shoring scaffolds for safe and economical transfer of high loads from the upper structure of the bridge.   TECON's all-in-one system offers excellent cost-effectiveness and fast equipment availability.   Long-term collaboration with leading beam equipment suppliers enhan

Advantages of High End Formwork System Over Conventional Steel Formwork

图片
  The purpose of the high-grade building formwork is to form and maintain the newly poured concrete so that it can reach a certain strength to withstand the temporary structure of its own weight and can be removed as a formwork. With the development of the construction industry, formwork engineering has become an important aspect of the construction industry. Vigorously developing formwork projects can not only improve the efficiency of the construction but also reduce costs.   In the early 1970s, Chinese building structures were dominated by brick-concrete structures, and building templates were dominated by wooden formwork; but because of the large use of wood, China ’s timber resources have become increasingly scarce. Later, China has successfully developed the advanced construction technology of combined steel formwork, which saved a lot of wood. The promotion and application of steel formwork have reached more than 75%. The production of steel formwork has reached more than 1,000