Dam Formwork DB180/240
TECON Dam formwork DB180/240 has high dependability and loading capacity for mass concrete structures without tie rods to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.
Features of Dam Formwork DB180/240
Shorten crane time due to one unit design of dam formwork.
It can produce both single side wall and double side wall inclined.
High load capacity without tie rod to pull through concrete structure.
It can be compatible with BASE 20 formwork, HETO Frame formwork and others.
A reliable anchorage system and muscular bracket strength ensure the highest on-site safety.
Specification of Dam Formwork DB180/240
No tie rods are needed to pull through the wall.
Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for a crane lift.
Features of Dam Formwork DB180/240 |
|
Shorten crane time due to one unit design of dam formwork. |
|
It can produce both single side wall and double side wall inclined. |
|
High load capacity without tie rod to pull through concrete structure. |
|
It can be compatible with BASE 20 formwork, HETO Frame formwork and others. |
|
A reliable anchorage system and muscular bracket strength ensure the highest on-site safety. |
|
|
|
Specification of Dam Formwork DB180/240 |
|
No tie rods are needed to pull through the wall. |
|
Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for a crane lift. |
|
|
|
Items | Technical details |
Available incline degree | 卤45掳 |
Width of the formwork | 2.2m/2.4m |
Maximum pouring height | 4m |
Power unit | Tower crane |
Required crane lifting power | 30kN/unit |
Distance of retrusion | 45cm |
Anchor point load capacity | 22kN |
Application of Dam Formwork DB180/240
One-sided construction projects such as dams, run-off river power stations and navigation locks.
Related Formwork of Dam Formwork DB180/240
TECON climbing formwork CB180/240
TECON self-climbing formwork TSC50/100
TECON Multi-function climbing Formwork MB180
FAQ
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork shuttering, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.