Dam Formwork DB180/240

 TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass concrete structures without tie rod to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.

 

Dam formwork 3D demostration without tie rod pull through the wallDam formwork 3D demostration without tie rod pull through the wall

Dam Formwork DB180/240

Dam Formwork DB180/240

Dam Formwork DB180/240

Dam formwork 3D demostration without tie rod pull through the wall

In-house dam formwork bracket mock up

Dam formwork climbing procedure via crane

GET A QUOTE

Features of Dam Formwork DB180/240

High load capacity without tie rod to pull through concrete structure

Can produce both single side wall and double side wall inclined

Shorten crane time due to one unit design of dam formwork

Reliable anchorage system and strong bracket strength ensures highest on site safety

Can be compatible with BASE 20 formwork, HETO Frame formwork etc.

 

Specification of Dam Formwork DB180/240

Two pieces of dam formwork climbing bracket together with TECON wall formwork section can be assembly into one complete unit for crane lift

 

No tie rods needed to pull through the wall

 

Items

Technical details

Available incline degree

±45°

Width of the formwork

2.2m/2.4m

Maximum pouring height

4m

Power unit

Tower crane

Required crane lifting power

30kN/unit

Distance of retrusion

45cm

Anchor point load capacity

22kN

 

Application of Dam Formwork DB180/240

One-sided construction projects such as dams, run-off river power stations and navigation locks

 

Related Formwork of Dam Formwork DB180/240

TECON-FORM climbing formwork CB180/240, TECON self-climbing formwork TSC50/100, TECON Multi-function climbing Formwork MB180

 


评论

此博客中的热门博文

The Concept of Building Formwork

TECON-Form Shuttering

Various Formwork Accessories are Also Available for Separate Purchase