NEWS OF THE WEEK
1.A visit in TECON Aluminum Formwork factory with Mr. Ashraf
Mr. Ashraf came from Middle East to Suzhou this weekend. For a large demand of aluminum formwork in his market. He has been searching for a superior supplier for a long time. Finally, he decided to visit us, out of all candidates. He was satisfied of our products and fabrication lines.
Aluminum Formwork is especially great for medium sized buildings. It can be used for wall, slab, column. The weight is only 25kg/m2, workers can move panels by hand. Design service life up to 300 times. It is an efficient and cost-saving solution ever. Mr Ashraf also decided to visit our other factories very soon.
2.Concrete Asia 2019
TECON team members have arrived at Thailand, under TECON sales director Edgar’s leadership. And preparing for the exhibition: Concrete Asia 2019. The 4th international exhibition and conference for the concrete and building construction industry.
We have displayed Steel frame formwork, plastic formwork, Alu-flex formwork for slab, steel props, and other accessories. Welcome everyone to visit our booth at NO. H17, 5-7 September 2019 at Hall 10, IMPACT Exhibition and Convention Center in Bangkok.
3.Yearly Health Examination of TECON Team
A yearly Health Examination has been arranged by our HR Department recently. All our team members have attend the examination in Jiulong Hospital in an early morning. It is necessary to check out the body statement, prevent any sickness. Ensure everyone is healthy, is a responsibility of company.
(source:https://www.teconform.com/news-of-the-week/)
Mr. Ashraf came from Middle East to Suzhou this weekend. For a large demand of aluminum formwork in his market. He has been searching for a superior supplier for a long time. Finally, he decided to visit us, out of all candidates. He was satisfied of our products and fabrication lines.
Aluminum Formwork is especially great for medium sized buildings. It can be used for wall, slab, column. The weight is only 25kg/m2, workers can move panels by hand. Design service life up to 300 times. It is an efficient and cost-saving solution ever. Mr Ashraf also decided to visit our other factories very soon.
2.Concrete Asia 2019
TECON team members have arrived at Thailand, under TECON sales director Edgar’s leadership. And preparing for the exhibition: Concrete Asia 2019. The 4th international exhibition and conference for the concrete and building construction industry.
We have displayed Steel frame formwork, plastic formwork, Alu-flex formwork for slab, steel props, and other accessories. Welcome everyone to visit our booth at NO. H17, 5-7 September 2019 at Hall 10, IMPACT Exhibition and Convention Center in Bangkok.
3.Yearly Health Examination of TECON Team
A yearly Health Examination has been arranged by our HR Department recently. All our team members have attend the examination in Jiulong Hospital in an early morning. It is necessary to check out the body statement, prevent any sickness. Ensure everyone is healthy, is a responsibility of company.
(source:https://www.teconform.com/news-of-the-week/)
评论
发表评论